![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEj3dx4C87CYmtu_YNG3dd5Y_dwL4mf_HvhuRv3VsWfy6fMJZ_PK8PMN2HDhgyHqUb_Tw1nn_GJn358bfhOWWtbJed0FrKjhsfAZLfqmX0U7LmKcmVt7_JkIoQkjZwPR-LGMW6m8u0LypRAT/s400/erith_goldaward.jpg)
Erith Group has been awarded the Considerate Contractor Scheme Gold Award by the City of London. The reason? Three demolition jobs performed inside the city limits, and a task not achieved before by a contractor within a 12 month period.
The specific projects include:
King William Street – situated adjacent to Prudentials European office and the heavy footfall of London Bridge.
London Development Project – in the heart of Farringdon neighbouring the City Temple.
Sugar Quay – located on the north bank of the River Thames adjacent to the iconic Tower Bridge.
The award is described as follows:
"The Gold Award recognises that the requirements of the Code of Good Practice have been consistently exceeded. It reflects a spirit of pride, an awareness of the needs of the passing public and regard for the surrounding environment."
Source: NFDC and Erith
No comments:
Post a Comment