January 27, 2012
CDI implode a Load-Out Tower (video)
Controlled Demolition Inc. must have someone on-site exclusively looking after filming their implosions, as it seems every building demolished gets multiple angles recorded. Not that we're complaining as we love seeing these videos at Demolish and Dismantle.
Earlier this week we got to see a DAP Buliding imploded at a chemical plant in Bartow, Florida. The building was 100-feet tall and comprised mainly of steel. This latest video is on the same site, and shows a Load-Out Tower that measures 120-feet tall being imploded. Again, the structure was mainly comprised of steel and it looked to be a very clean blast.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment